Will OT/PT be located far from SPED?

Posted by:

During the Phase 1 process, a concept design was created to account for spaces, and the general locations of those spaces are used to determine the approximate size and shape of the building. During the next phase of the project, a further detailed design will provide refinement of the plan with more in depth feedback from user groups.

Author: